From 1.1.2021 on, data for the generation published on ELES website is presented as production of generation units that are directly connected to the transmission network (generation of HPS Avče is included). The generation connected to the distribution network (small hydropower plants, solar power plants, etc.) is not covered in the published numbers. Data for the complete generation in Slovenia are published on https://transparency.entsoe.eu/ .
The figure shows the total NPP Krsko generation according to the ENTSO-E methodology for short-term and seasonal adequacy assessment. According to the interstate treaty between the Republic of Slovenia and the Republic of Croatia, half of the electricity produced in the NPP Krsko belongs to the Republic of Croatia.