VESTI IZ SVETA ELESA

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Phasellus lectus magna, dictum eu nisl vitae, accumsan dapibus diam. Vestibulum consequat quam quis neque vestibulum venenatis. Nullam at euismod lectus, vitae elementum ex.

Auction For Ancillary Services for 2010/explanation to Annex 9

For determination of energy price of tertiary control reserve, the client is additionally publishing the following explanation to Annex 9. 

»The bidder can specify the price for tertiary control reserve based on the price index of fuel, which is used for generating electricity with regulating unit(s). At the bid selection prices, the client will consider the offered energy price, while the contracting energy price can differ from the offered price, such that the difference represents only the difference between the fuel costs at the time of the auction and the fuel costs at the time of delivery.

The price index of fuel, which will be used as the basis for changing the energy price of tertiary control reserve must be publicly available and must represent the price of delivery for this type of fuel.