Implementation of European regulations

ELES as the transmission system operator of the electric power network is in accordance with the legislation obliged to notify the public about the procedures of adoption and implementation of European regulations in the field of electric power transmission.

Network access

Regulation establishing a network code on requirements for grid connection of generators (NC RfG)

The Regulation establishing a network code on requirement for grid connection of generators (NC RfG) entered into force on 17 May 2016. The provisions of NC RfG set out detailed rules relating to the connection of, principally, new power generating installations to national electricity networks.

Documents:

Regulation establishing a Network Code on Demand Connection (DCC)

The Regulation establishing a network code on demand connection (DCC) entered into force on 7 September 2016. The provisions of DCC set out detailed rules relating to the connection of, principally, new demand facilities to national electricity networks.

Documents:

Regulation establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (HVDC)

The Regulation establishing a network code on requirements for grid connection of high-voltage direct current system and direct current-connected power park modules (HVDC) entered into force on 28 September 2016. The provisions of HVDC set out detailed rules relating to the connection of, principally, new high-voltage direct current systems to national electricity networks.